Amazon Cash Flow & Reorder Calculator
Estimate reorder timing, supplier-deposit funding gaps and stockout exposure under baseline, sales growth and shipping-delay scenarios.
Read article →Compare supplier MOQ with demand, lead time, safety stock, landed cost, and available inventory capital.
A supplier's minimum order quantity (MOQ) reflects what the supplier will accept. It does not tell you how many units your store can sell or safely fund. I would calculate a range of order quantities before negotiating, with demand confidence and the money available for inventory written down separately.
Start with expected daily demand, the full replenishment lead time, a safety-stock allowance and when you expect to place the next order. A reorder point is expected demand during replenishment lead time plus safety stock. An initial order must also cover any planned selling period before that reorder is placed. If lead time is 35 days and expected sales are 12 units/day, the lead-time requirement alone is 420 units. This is not a forecast guarantee.
Using $7 landed cost per sellable unit, three lean, balanced and aggressive examples are 480 units ($3,360), 620 units ($4,340) and 850 units ($5,950). At 12 units a day, these represent 40, about 52 and about 71 days of stock respectively. They are illustrative scenarios, not an optimal order generated from a statistical safety-stock model.
A supplier MOQ of 1,000 units would cost $7,000 and cover about 83 days at the assumed demand. If the inventory budget is $4,500, it exceeds the budget by $2,500, while the balanced scenario fits with just $160 of inventory headroom. The remaining launch and reorder budgets must already be reserved elsewhere; they are not part of this $4,500 example.
Lean · 480 units: 3360 USD; Balanced · 620 units: 4340 USD; Aggressive · 850 units: 5950 USD; Supplier MOQ · 1,000: 7000 USD
At six units per day, the 620-unit scenario would take about 103 days to sell through, before allowances for returns or damaged inventory. At 18 units per day it covers about 34 days, shorter than the 35-day replenishment lead time if no inbound stock is already on order. A strong launch can therefore expose a stockout problem while a weak one exposes capital tied up in stock.
If the forecast is uncertain, favor a controlled test where the sourcing economics and service promise allow it. A lean quantity reduces exposure but may raise unit costs or increase stockout risk. A larger first batch may improve unit economics, but only if the business can bear slow sell-through. A genuine safety-stock estimate should reflect uncertainty in demand and lead time rather than an arbitrary percentage.
Ask about smaller runs, mixed variants under one minimum, less complex packaging, or a higher per-unit price for a test batch. Compare a second supplier if necessary. A higher unit cost may still be worthwhile if the total capital at risk falls and contribution stays above the target. If no feasible quote fits both limits, do not accept the MOQ solely because it is the minimum offered.
Check maximum landed cost again after negotiating and plan the date of the next purchase order using reorder cash flow. The first batch is not the entire funding problem.
Only when the quantity also fits the demand, margin, service and capital assumptions.
It increases expected lead-time demand for the same daily sales and may require a different safety buffer and earlier reorder.
Compare the reduced cash exposure and remaining contribution against the higher unit cost and replenishment risk.